• Zinc Coated Bundy Tube/Pipe
  • Zinc Coated Bundy Tube/Pipe
  • Zinc Coated Bundy Tube/Pipe
  • Zinc Coated Bundy Tube/Pipe
  • Zinc Coated Bundy Tube/Pipe
  • Zinc Coated Bundy Tube/Pipe

Zinc Coated Bundy Tube/Pipe

Type: Welded
Technique: Cold Rolled
Material: Alloy Steel
Surface Treatment: Copper Coated
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape: Round
Samples:
US$ 1/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Transport Package
Seawirthy
Specification
Customized
Trademark
MAXCOOL
Origin
China
Production Capacity
5000000tons

Product Description

Product Description

Specifications

Popular size:Diameter 4mm,4.76mm, 6mm, 6,35mm, 7.94mm 
Thickness:0.5mm, 0.65mm, 0.7mm 
Brand Customer: Haier, Daewoo, LG, Pouya

Specification: to ASTM A 254

1. Material: Low carbon steel tube

2. Popular size: Diameter 4mm, 4.76mm, 6mm, 6.35mm, 7.94mm, 8mm, 12mm

3.Thickness:0.5mm, 0.65mm, 0.7mm

4. Annual output:8000 tons

5. Brand Customer: Haier, Daewoo, LG, Pouya

6. Condenser and evaporator, According to customer's drawing

Production

Name

Bundy tube and condensers

Main use

Widely used in Compressor,Condenser,Evaporator,Refrigerator etc

Elongation

More than 25%

Standard

ASTM B338

Brand

Hongbao

Application

heat exchanger,condensor . 

environmental protection equipment

cooling pipe

titanium heat pipe

Electroplating equipment

ring

precision instruments

Feature

High corrosion resistance,

low density,

good thermal stability

Packing

Wooden case as outside,plastic bag as inside,or

standard export packaging( as the customer request )

Min

Order

200kg

Payment

terms

L/C, T/T

Delivery

time

15-30 days  (according to the quantity and process of the product)

Quality

And test

Strict test is indispensible,because we must insure our clients get the best product


Packaging & Shipping

Packaging Details:pallet
Port china
Lead Time : 15-20days
Zinc Coated Bundy Tube/Pipe
Zinc Coated Bundy Tube/Pipe
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now